Outlook Townhomes at Decair Street
Location: Coquitlam, BC
Overview
In 2004, the Boffo Construction Group retained Binnie to design the roads and services and the siltation control program for the 31 mountain-style townhomes constructed on a steep and challenging site in City of Coquitlam.
Due to its steep terrain, we constructed a Sierra Slopes Retention System on the downhill side of the development. This system enabled the developer to maximize the usable land and stabilize the previously undevelopable areas for the development. When fully vegetated, the slopes of this stair-stepped structure will blend in with the natural terrain, enhancing the appearance and value of the development.
On the uphill side of the development, we built a decorative shotcrete retaining wall at the back of some of the townhomes. Above the shotcrete wall the existing embankment disturbed by the construction was restored and revegetated to its natural environment.
|




For more information on our Services contact:
Fraser Valley
jpaley@binnie.com
604.574.3336
Lower Mainland
jmartens@binnie.com
604.420.1721
Sea to Sky Country
tchow@binnie.com
604.892.8222
Vancouver Island
mnewton@binnie.com
250.738.0995
Sunshine Coast
staylor@binnie.com
604.740.9816
|