Binnie Projects


The project was located on Siphon Creek Road approximately 40 Kms North of Fort St. John beginning at the junction of 188 Doig Road and the 184 Siphon Creek Road, and ending 5 kms South on the Siphon Creek Road.  The project involved the loading, hauling and...

This Project was delivered under 2 separate contracts with Phase 1 completed in 2009 and Phase 2 completed in the summer of 2010. Phase 1 was from the Fraser River Bridge to the Continental overpass in Prince George. This 2.4 kilometer long project included the widening of...

Project was initiated at 59 Mile and extended North 2.5 kilometers. One of the major challenges of this project was the 60KV power line which was relocated for the entire length of the project.  There were also road profile and drainage issues which were...

The project entailed constructing a 2.0 km long passing lane from Sunny Slope to Hillcrest Way.  Key components of construction included roadway and drainage excavation, grade construction and placement of aggregates, pavement milling and removal, installation and...

This project is located between Prince George and Chetwynd on Highway 97 and is approximately 90 kilometres south of Chetwynd between Bennett and Link Creek. The project provides for reconstruction and widening of 11.2 kilometres of the existing highway which includes...

The project, located on Farrell Creek Road, was 15.53 km long - 15 km North East of Hudson's Hope.  The purpose of the project was to upgrade the existing road for the oil and gas industry. This was accomplished by widening the existing road to the Peace River...

The project was located on Upper Halfway Road #117 – from km 46.0 to 54.1, 72km North of the City of Fort St. John on the Alaska Highway #97. The project entailed the reconstruction and widening of 8km of existing gravel roadway including base repairs and drainage...