Binnie Projects


Project entailed road widening with new bus bay, curb and sidewalk for 265m on Hammond Bay Road from Departure Bay Road intersection.  This included closing in the ditch and installing a new storm sewer and storm services; the replacement of 150m of 200mm diameter AC...

The Central Valley Greenway is a new 24-kilometre cycling and walking path that runs near the Millennium Line SkyTrain through Vancouver, Burnaby, and New Westminster. This dedicated cycle and walking path from Science World to New Westminster Quay links to plenty of parks,...

The Campbell Heights Industrial area in Surrey was serviced by an interim sanitary sewer system that had reached capacity with completed and approved developments for the region. The scope of work involved the design and construction of the ultimate sanitary sewer to service...

The $4.6 million dollar BC Visitor Centre ar Peace Arch in Surrey, BC is a stunning facility showcasing BC wood products to visitors in the more than 3 million vehicles that pass through the Peace Arch border every year.  The facilty was opened in February 2009 in...

The scope of work for this project involved the upgrading of the existing 2-lane roadway, formerly the Trans Canada Highway, to a 4-lane divided arterial standard.  The work included road widening, upgrading of existing municipal utilities, sidewalks, bus bays,...

The City of Abbotsford retained Binnie to provide civil engineering design and contract administration services for the upgrading and reconstruction of Maclure Road between Gladwin Road and Horn Street. Approximately 1,000 metres of Maclure Road was widened from a two-lane...

The District of Pitt Meadows retained Binnie to review the condition of a sanitary sewer on Mitchell Road and determine the best method to rehabilitate the pipe. Due to the poor soils and depth of the sewer, we suggested using a trenchless technology method.

The...

The District of Pitt Meadows retained Binnie to design and administer the construction of a replacement wet well and pumps for a failing sanitary pump station. The challenge was to maintain the existing station while the remedial work was undertaken. Compounding the fact that...